• 509-884-7191
  • 1-800-503-7990
  • 1151 Valley Mall Parkway, East Wenatchee, WA 98802
Search
Close this search box.
Facebook-f Twitter Youtube
Home page
  • Customers
    • Customer Center
    • Online Payment
    • Electric Service
    • Broadband Service
    • Withrow Water
    • Energy Conservation
  • Work With Us
    • Work with DCPUD
    • Employment
    • Job Listings
    • Purchasing & Contracting
    • Bid Opportunities
  • Environment
    • Environmental Stewardship
    • Fish Counts
    • Parks and Recreation
    • Hatcheries
    • Environmental Commitments
  • About
    • About Us
    • Contact Us
    • Commissioners
    • News Room
    • History
    • Wells Dam
    • Hydrogen Facility
Menu
  • Customers
    • Customer Center
    • Online Payment
    • Electric Service
    • Broadband Service
    • Withrow Water
    • Energy Conservation
  • Work With Us
    • Work with DCPUD
    • Employment
    • Job Listings
    • Purchasing & Contracting
    • Bid Opportunities
  • Environment
    • Environmental Stewardship
    • Fish Counts
    • Parks and Recreation
    • Hatcheries
    • Environmental Commitments
  • About
    • About Us
    • Contact Us
    • Commissioners
    • News Room
    • History
    • Wells Dam
    • Hydrogen Facility

New Development Form

New Douglas PUD Customers may be asked to provide a letter of credit or a deposit to start service. This is not an electrical permit application – Electrical permits may be obtained at WA Dept. of Labor & Industries.

Please submit this application with an Electronic CAD file of your preliminary plat.

Applicant/Owner Name
Spouse/Alt Contact
Mailing Address
Contractor Name

Service Requested

Have you been a Douglas PUD customer before?
If yes, last service address
Job site address (if known)
Service Requested
Desired Voltage

Load Information (Commercial/Large load)

Please submit this application with an Electronic CAD file of your preliminary plat. Any spatial data submitted for you project must have a coordinate system and projection specified (preferably NAD83 / Washington State Plane North (ftUS)). Simplifying CAD drawings to only include proposed lot lines (for subdivisions) or the parcel boundaries will make it easier for our engineers to begin work and increase the accuracy of their estimate. Data that is unreferenced or unprojected may result in a $100 geoprocessing fee and may be added to the overall developer cost.
Max. file size: 256 MB.
  • For Customers
    • Online Payment
    • Electric Service
      • Residential Service
      • Commercial Service
        • Alter Existing Service Form
        • New Development Form
        • Conduit Inspection Form
      • Net Metering Interconnection Standards
    • Broadband
    • Withrow Water System
    • Energy Conservation
    • Customer Service Policies and Rate Schedules
    • Outage Information

Quick Links

  • Sitemap
  • Financials
  • Public Records Request
  • Fish Counts
  • Job Listings
  • Electric Service Guide
  • Power Rates
  • Outages
  • Land Use Policy
  • Auditorium Booking

Office Locations

Office hours 8am to 5pm Monday through Friday.

East Wenatchee Office – Main Office
1151 Valley Mall Parkway
East Wenatchee, WA  98802

Bridgeport Office
109 13th Street
PO Box 1119
Bridgeport, WA  98813

Important Numbers

Payments – Opciones en Español1-844-203-6546
East Wenatchee 509-884-7191
Bridgeport 509-686-4501
Call before you dig 811

Follow Us

Facebook-f Twitter Youtube

© 2021 | all rights reserved | Website by AndiSites Inc.
Employee Links: email | remote