Ditch Inspection Request

Name(Required)
Completion of preparation certification(Required)
Schedule 40 gray PVC power and communication conduit(s) have been installed to depth (3′ deep for secondary and primary).The communication conduit stubs outside the transformer, handhole , vault etc. 36” radius sweeps have been installed and there are no more than 3 sweeps and at least 10 feet of conduit between any 2 sweeps. Conduits are swept up 6” (minimum) above final grade. If installing conduit from a power pole, conduits are swept up 6”- 8” away from the pole under the existing standoff brackets.
Drop files here or
Max. file size: 256 MB.

    Please Note:

    • PUD crews will install the customer provided sweep into an existing padmount transformer or handhole. DO NOT PLUMB SWEEP INTO TRANSFORMER OR HAND HOLE (the trench must be accessible).
    • The trench for conduit shall be to the edge of a padmount transformer or handhole.
    • Communications conduit shall be swept up 1-ft to the right/backside of the padmount transformer or handhole when facing the front (labeled side), unless otherwise approved.
    • For single phase 600 and 800 amp services, install two (2) 3” gray schedule 40 conduits.
    • Conduit must be inspected by PUD personnel prior to backfilling.
    • When backfilling, install Douglas County PUD supplied warning tape 12”- 18” above power conduit.
    • Conduit must be backfilled to final grade prior to PUD crews installing wire.

    *Please be advised that it can take up to 48 hours for a ditch inspection to be completed once it has been assigned to our Operations Department.